LA COLINA JUNIOR HIGH SCHOOL DAMAGED SWITCHBOARD REPLACEMENT #06-24/25
The Project description is as follows: 1. Remove the Existing, Demand Switchboard. 2. Provide a New Switchboard. 3. Reconnect Existing Circuits 4. Coordinate Disconnect and Reconnect with SCE 5. Remove and Replace the Existing Transformer.
PLANS
(click to expand/collapse)

Name | Size | ||
24319 2024-06-11 | 1.0 MB |