LA COLINA JUNIOR HIGH SCHOOL DAMAGED SWITCHBOARD REPLACEMENT #06-24/25
The Project description is as follows: 1. Remove the Existing, Demand Switchboard. 2. Provide a New Switchboard. 3. Reconnect Existing Circuits 4. Coordinate Disconnect and Reconnect with SCE 5. Remove and Replace the Existing Transformer.
ADDENDUM #1
(click to expand/collapse)

Name | Size | ||
Addendum 1 - La Colina JHS Damage Switchboard Replacement | 267.6 KB |