PW 22-47 OWTP Headworks VFD Replacement Project

Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to replace four (4) existing variable frequency drives (“VFD’s”) and remove two (2) existing soft starts and replace them with VFDs at the Headworks area of the Oxnard Wastewater Treatment Plant (“OWTP”) located at 6001 Perkins Road.
SPECIFICATIONS (click to expand/collapse)