PW 22-47 OWTP Headworks VFD Replacement Project
Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to replace four (4) existing variable frequency drives (“VFD’s”) and remove two (2) existing soft starts and replace them with VFDs at the Headworks area of the Oxnard Wastewater Treatment Plant (“OWTP”) located at 6001 Perkins Road.
ADDENDUM #1
(click to expand/collapse)
Name | Size | ||
PW 22-47_Addend1_Bid Due Date Extension | 220.6 KB |
ADDENDUM #2
(click to expand/collapse)
Name | Size | ||
OWTP-Headworks-AS-BUILTS | 143.9 MB | ||
Oxnard-Headworks-VFD-PLC-2024_06_13 | 13.3 MB | ||
PW 22-47_Addend2_rfi+plans | 245.7 KB |
ADDENDUM #3
(click to expand/collapse)
Name | Size | ||
PW 22-47_Addend3_RFI's | 225.8 KB |