PW 22-47 OWTP Headworks VFD Replacement Project

Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to replace four (4) existing variable frequency drives (“VFD’s”) and remove two (2) existing soft starts and replace them with VFDs at the Headworks area of the Oxnard Wastewater Treatment Plant (“OWTP”) located at 6001 Perkins Road.
ADDENDUM #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PW 22-47_Addend1_Bid Due Date Extension 220.6 KB
ADDENDUM #2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
OWTP-Headworks-AS-BUILTS 143.9 MB
Oxnard-Headworks-VFD-PLC-2024_06_13 13.3 MB
PW 22-47_Addend2_rfi+plans 245.7 KB
ADDENDUM #3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PW 22-47_Addend3_RFI's 225.8 KB