HESD #24-25-01 Bard Es Painting Project
The Richard Bard ES Painting project consists of the following: A Complete surface preparation and painting of ALL exterior surfaces for All buildings, portables, conex boxes, railing(steel and galvanized), poles, fence(s), block walls, marquee frame, existing art work minor repairs across the school, enclosures, doors, railings, signage, structural elements, fascia replacement, stencil removal & replacement, and curb painting.
1. PROJECT SPECIFICATIONS
(click to expand/collapse)

Name | Size | ||
HESD#24-25-01 R. Bard ES DE Spec | 4.1 MB | ||
HESD 24-25-01 - Bard ES Paint Specs | 1.2 MB |
2. FRONT END DOCS
(click to expand/collapse)

Name | Size | ||
HESD#24-25-01 Bard ES FRONT END DOCS Proj 250417 | 1.1 MB |
3. ADDITIONAL DOCS
(click to expand/collapse)

4. EXHIBIT
(click to expand/collapse)

Name | Size | ||
Exhibit A - HESD #24-25-01 Bard ES Milestone Schedule | 150.2 KB | ||
Exhibit B - HESD #24-25-01 - Bard ES GPRS Survey | 13.8 MB | ||
Exhibit C - HESD #24-25-01 Bard ES Room Number | 14.4 MB |
5. SPECIFIC SCOPE
(click to expand/collapse)

Name | Size | ||
HESD #24-25-01 - Scope of Work 250417 | 9.3 MB |