PW 24-62 OXNARD BEAUTIFICATION & CLEANUP PROJECT

Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to beautify 5 local parks including Camino Del Sol Community Garden, Del Sol Park, Lemonwood Park, Rudolph Beck Memorial Park, and Southwinds Park. Work consists of removing existing turf and plant material which has exceeded its lifespan, and replacing it with drought-tolerant plantings and efficient irrigation systems, installing concrete, asphalt, and decomposed granite paved walkways and plazas, providing ADA compliant parking and pavement markings and seating, and improving circulation through planted areas.
ADDENDUM #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PW 24-62 Addend-1_30% Self Performance 867.2 KB
ADDENDUM #2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PW 24-62 Addend-2_Rev TS101400+RFI responses 541.0 KB
ADDENDUM #3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PW 24-62 Addend-3_RFI response 280.5 KB
ADDENDUM #4 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PW 24-62 Addend-4_REVISED APPENDIX B - Davis Bacon Wage 02.21.25 1.7 MB
ADDENDUM #5 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PW 24-62 Addend-5_due date extended (1) 244.3 KB
ADDENDUM #6 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PW 24-62 Addend-6_due date extended 222.0 KB
ADDENDUM #7 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PW 24-62 Addend-7_RFI reply+revisions 3.3 MB
REVISED Appendix B - Davis-Bacon Act Wage Determination-Feb 28, 2025 665.4 KB
Revised LI-1.5 1.1 MB