Baseball/Softball Changing Rooms Bid No. 25-01
The scope of work consists of site demolition, grading and concrete foundation work for a new modular building, concrete flatwork, ADA drop-off area, utilities including electrical, fire, water, site drainage, building electrical, chain link fencing, flooring, lockers and limited door hardware.
PLANS
(click to expand/collapse)

Name | Size | ||
Ball Fields Changing Rooms Drawings | 371.3 MB |