Baseball/Softball Changing Rooms Bid No. 25-01

The scope of work consists of site demolition, grading and concrete foundation work for a new modular building, concrete flatwork, ADA drop-off area, utilities including electrical, fire, water, site drainage, building electrical, chain link fencing, flooring, lockers and limited door hardware.
ADDENDUM #1 (click to expand/collapse)
1. Addendum No. 1 Cover Sheet
2. Responsibility Matrix
3. Draft Project Schedule
This is available for download to registered users. Log in now
Name Size
Addendum 1 Bid 25-01 31.1 KB
Project Schedule 713.8 KB
Responsibility Matrix 3.2 MB
ADDENDUM #2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 2 Bid 25-01 15.2 MB