Baseball/Softball Changing Rooms Bid No. 25-01
The scope of work consists of site demolition, grading and concrete foundation work for a new modular building, concrete flatwork, ADA drop-off area, utilities including electrical, fire, water, site drainage, building electrical, chain link fencing, flooring, lockers and limited door hardware.
ADDENDUM #1
(click to expand/collapse)
1. Addendum No. 1 Cover Sheet
2. Responsibility Matrix
3. Draft Project Schedule
2. Responsibility Matrix
3. Draft Project Schedule
Name | Size | ||
Addendum 1 Bid 25-01 | 31.1 KB | ||
Project Schedule | 713.8 KB | ||
Responsibility Matrix | 3.2 MB |
ADDENDUM #2
(click to expand/collapse)
Name | Size | ||
Addendum 2 Bid 25-01 | 15.2 MB |