PW 24-92 Storm Drain Catch Basin Trash Excluder Project FY 24/25
Project includes furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work to install trash excluder devices on existing storm drain catch basins.
APPENDICES
(click to expand/collapse)
Name | Size | ||
Appendix A_Exhibits 1-108 Map Locations | 434.5 MB | ||
Appendix B_Exhibit 109-FCD design | 1.1 MB | ||
Appendix C_Catch Basins List FY 24-25 | 96.5 KB | ||
Appendix D_SW-1-BMP-Worksheet-Less-than-1-Acre | 181.4 KB |
SPECIFICATIONS
(click to expand/collapse)
Name | Size | ||
PW 24-92 Storm Drain Trash Excluder 24.25 ARPA Bid Package | 12.6 MB |