NOTICE INVITING BIDS
PARKING LOT 19A DRY STORAGE IMPROVEMENTS NORTHWEST CORNER OF HARBOR BLVD. & SCHOONER DR.
1 NOTICE IS HEREBY GIVEN that sealed bids will be received by the Ventura Port District, Ventura, California for furnishing all plant, labor, services, materials, tools, equipment, supplies, transportation, utilities, and all other items and facilities necessary therefore, as provided in Contract Documents described in Section 8 below, for Parking Lot 19A Dry Storage Improvements - Northwest Corner of Harbor Blvd. & Schooner Dr., with all appurtenances thereto, in strict accordance with the specifications on file at the Office of the General Manager, Ventura Port District, 1603 Anchors Way Drive, Ventura, Ventura County, California.
2 DATE OF OPENING BIDS. Bids must be filed with the Ventura Port District at the office of the Ventura Port District, 1603 Anchors Way, Ventura, California, 93001 no later than Wednesday, May 14, 2025 at 1:30PM, at which time and place the bids will be publicly opened and read aloud. Bids shall be submitted in sealed envelopes marked on the outside, “Parking Lot 19A Dry Storage Improvements - Northwest Corner of Harbor Blvd. & Schooner Dr.”
3 LOCATION OF THE WORK. The work to be constructed hereunder is located at Northwest Corner of Harbor Blvd. and Schooner Dr., approximately one-half mile north of the Santa Clara River and adjacent to Harbor Boulevard in the City of San Buenaventura.
4 DESCRIPTION OF WORK. The work consists of new electrical service, pedestal, breaker panel and onsite power distribution per sheets E100 – E600 plus civil work on sheet CB1 for planters, striping, fencing and gates. In addition, the work includes, at the Port's discretion, all items included in PARKING LOT 19A DRY SOTRAGE IMPROVEMENT FOR VENTURA PORT DISTRICT LANDSCAPE CONSTRUCTION PLANS, SCHOONER DRIVE. -
CITY OF VENTURA, to include but not limited to, all landscaping, planting, and irrigation as called out by above stated plan set.
5 MANDATORY PRE-BID CONFERENCE. A mandatory pre-bid conference will be conducted at the site on Wednesday, May 7, 2025 at 1:30PM. The meeting location will be in the parking lot located at the Northwest Corner of Harbor Blvd. and Schooner Dr. At this time bidders may tour the facilities. None of the information transmitted in this meeting will be construed in any way to modify the plans and specifications. Any modification will be forwarded to all plan holders as an addendum.
6 AWARD OF CONTRACT. Bidder understands, acknowledges, and agrees that bids for the work described herein are for one (1) trash enclosure identified in Section 4, above, as the Owner determines in its sole and absolute discretion. Bidder understands that Owner will award the contract to only one (1) lowest responsible bidder as selected by the Owner in its sole and absolute discretion. The Owner reserves the right, after opening bids, to reject any or all bids, or to make award to one (1) lowest responsible bidder on the bid items set forth on the Bid Sheet attached to the Bid and reject all other bids on any of said bid items, in the manner set forth under the California Uniform Public Construction Cost Accounting Act pursuant to Public Contract Code Section 22000 et seq. Bids will be compared on the basis of the District’s Engineer's estimate of the quantities of the several items of work as shown on the Bid Sheet(s). A good faith determination by the Owner as to whether a bid is responsive or whether a bidder is responsible shall be final, conclusive and binding, and shall not be the basis of a claim for lost profits or damages of any kind whatsoever by a bidder to whom the contract is not awarded. The Owner will award a contract or reject all bids within 90 days of the bid opening and no bid may be withdrawn during that period. The Owner reserves the right to waive or seek correction of immaterial errors in a bid, in Owner’s sole discretion. The Owner’s determination that an error is immaterial shall be final, conclusive and binding on all bidders.
7 CERTIFIED CHECK AND BONDS. Each bid shall be accompanied by cash, a certified cashier's check, or by a corporate surety bond on the form furnished by the District, as a guaranty that the bidder will, if an award is made to bidder in accordance with the terms of bidder’s bid, promptly secure worker's compensation insurance and liability insurance, execute a contract in the required form, and furnish satisfactory bonds for the faithful performance of the contract and for the payment of claims of materialmen and laborers thereunder. Said cash, check, or surety bond shall be in an amount not less than 10 percent of the total highest amount of any bid item set forth on the Bid Sheet (see illustrations provided on page B-1 of Bid). Faithful Performance Bonds and Payment Bonds shall each be for not less than 100 percent of the amount set forth by the Contractor on Contractor’s Bid Sheet. The Owner reserves the right to reject any bond if, in the opinion of the Owner’s Legal Representative, the Surety's acknowledgement is not in the form included in the contract documents or in another substantially equivalent form as prescribed by law. The bid security of unsuccessful bidders shall be returned to such bidders within sixty (60) days of the time the award of contract is made.
8 PREVAILING RATES OF WAGES. In accordance with the provisions of the California Labor Code, the Director of the Department of Industrial Relations of the State of California has ascertained and determined the general prevailing rates of wages for general, holiday and overtime work in the locality in which the work is to be performed. The applicable California prevailing wage rate can be found at www.dir.ca.gov and are on file with the Agency’s principal office, which shall be available to any interested party upon request. The contractor is also required by Labor Code Section 1771.4 to have a copy of the applicable wage determination posted and/or available at each jobsite. It shall be mandatory upon the contractor to whom the contract is awarded and upon any subcontractor under the contractor to pay not less than the prevailing specified rates to all workers employed by them in the execution of the contract. The public entity for which work is being performed or the California Department of Industrial Relations may impose penalties upon contractors and subcontractors for failure to comply with prevailing wage requirements. These penalties are up to $200 per day per worker for each wage violation identified;
$100 per day per worker for failure to provide the required paperwork and documentation requested within a 10-day window; and $25 per day per worker for any overtime violation. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractors and subcontractors failing to comply with the prevailing wage requirement are subject to debarment by the Labor Commissioner, as provided in Labor Code Section 1771.1. Debarred contractors are declared ineligible to perform work on any public works project, either as the prime contractor or a subcontractor.
9 CONTRACT DOCUMENTS. The contract documents shall consist of this Notice Inviting Bids, the Instructions to Bidders, the accepted Bid, the Bid Sheet, the Contractor's Licensing Statement, the List of Subcontractors, the Bid Security Form or Bid Bond, the Agreement, the Faithful Performance Bond, the Payment Bond, the Non-Collusion Affidavit, the General Conditions of the Contract, the Special Conditions of the Contract, and the Detail Specifications and Drawings, all of which are on file in the office of the General Manager, Ventura Port District, Ventura, California.
Copies of the drawings, specifications and bidding documents may be obtained for purchase on or about Friday, April 25, 2025 from the CyberCopy Public Plan Room Access internet site at https://www.cybercopyplanroom.com/jobs/public. Bidders shall be solely responsible for making any and all arrangements necessary directly with CyberCopy, 3020 Sherwin Ave., Ventura, CA 93003, to order, purchase, and have delivered any and all paper and/or digital copies of the drawings, specifications, and bidding documents. Questions about how to obtain and procure the documents may be directed to Ian Fitzgerald of CyberCopyUSA at (805) 642-3292 or dfs@cybercopyusa.com.
10 SECURITY FOR PERFORMANCE. Pursuant to California Public Contract Code Section 22300, securities may be substituted for any moneys withheld by the Owner to ensure performance under the contract. If such securities are desired to be utilized by any bidder, they shall be utilized in accordance with the provisions of Public Contract Code Section 22300 and, as required by those provisions, the bidder shall bear any expenses incurred due to the use of such securities.
11 BIDDER OBLIGATIONS. Each bidder shall carefully examine the drawings, read the specifications and the forms of the contract documents, and shall visit the site of the proposed work to fully inform bidder as to all existing conditions and limitations that may affect the execution of work under the contract, and shall include in the prices bid the cost of all incidentals and appurtenances. The failure or omission of any bidder to receive or examine any form, instrument, addendum, or other document, or bidder’s failure to visit and become acquainted with the conditions at the construction site, shall in no respect relieve bidder from any obligation imposed by bidder’s bid or by the contract. The submittal of a bid shall be taken as prima facie evidence of compliance with all instructions contained herein.
12 CLASSIFICATION OF CONTRACTORS' LICENSES.
Contractors submitting a proposal shall possess, at the time the contract is awarded, the following class of contractor's license(s) issued pursuant to Division 3, Chapter 9, of the Business and Professions Code of the State of California Classification B – General Building Contractor. The Contractor shall certify that the license(s) specified are the classification(s) required to perform the Work contemplated under the Contract Documents. Contractor shall provide Owner with their Contractor's license number and expiration date as provided in the Proposal and shall present satisfactory evidence that they are licensed in good standing.
13 REGISTRATION WITH DEPARTMENT OF INDUSTRIAL RELATIONS.
No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. Contractors MUST be a registered “public works contractor” with the DIR AT THE TIME OF BID. Where the prime contract is less than $15,000 for maintenance work or less than $25,000 for construction alternation, demolition or repair work, registration is not required.